Draft ZIP to modify ZIP 1014: Extending the Dev Fund by one year

That’s basically what ECC is proposing. Josh has said that he would rather have a grant based funding program than the direct funding model that we have now.

The one year period is supposed to be a maximum/worst-case scenario, ideally something would be implemented well before a year:

at any point within this one-year extension period, that model will supersede and terminate the one-year extension.

The first step is figuring out if the community supports the grants based model, if that’s the case then a temporary extension to design a new system makes sense.

If there’s not enough support for a grants style system then the extension is moot, a block-reward slice system doesn’t need a year to design.

3 Likes